Familiar Technologies: Leica System 1200, Leica Viva
Regions of the world you have worked: Western Canada
Resume: Education: Red Deer College – spring of 2008 – 2009 for 1st and 2nd year apprenticeship.
October 2010 – April 2011
Duties included: Using GPS backpacks locating seismic drilling and
receiver points. Access to these locations would be on quads or
skidoos. Working on all types of terrain and temperatures I would
keep detailed notes for the drillers, so they were able to access
the drill points with minimal ease and avoid obstructions. Worked for this
company in 2008-2009 as stated below.
Flint Energy Services. – August 2009 to October 2010
Duties Include: Installation of Glycol heat tracing and insulated
tubing, pipefitting, installation of pipe spools, building hydro test
and pneumatic test packages, rigging installation of structural
steel, QC work etc.
Ball Brothers Instrumentation Inc. Phone – 403.669.9467 April 2009 – to August 2009
Duties included: for completion Installation of all control instruments in separator skids, line heaters, multiple well header skids, pig launcher – receiver skids. Calibration of instruments, bending instrument tubing, overseeing other workers, schedule planning dates, managing daily workload for crew of 5 people.
Planning the location and types of instruments to use, in order for operators to have an easier task of operating the equipment and instruments. Basic pipefitting was also a daily routine, along with structural welding. Reading of Process and Instrumentation diagrams was a day to day aspect of the job.
Cook Leach Surveys Ltd. Phone – 403.852.5734 Noel Leach
October 2008 – April 2009
Duties included: Using GPS backpacks locating seismic drilling and
receiver points. Access to these locations would be on quads or
skidoos. Working on all types of terrain and temperatures I would
keep detailed notes for the drillers, so they were able to access
the drill points with minimal ease and avoid obstructions.
Paintearth Energy Manufacturing Services. Phone – 403.884.2442
May 2005 – October 2008
Duties Included: Installation of control instruments in all types of
skids, line heaters, well headers etc. Calibrated various gages and
instruments. Installed and bent tubing. Supervised and instructed
others instrumentation workers on projects to be done. Made
sure projects were completed on time.
Saftey Tickets: all current
H2S ALIVE, FIRST-AID, TDG, WHIMIS, ATV SAFETY
References Upon request.
